PREPARED FOR COLD SEASON. Apa-Canal Chisinau is prepared to provide thermal agent
The three thermal power plants in Apa-Canal Chisinau SA are ready for the cold season and, if necessary, they are ready to start supplying the heating agent at any time. This was announced by the technical director, Anatol Lichii, on Monday, September 10, during the operative session of the Mayoralty, transmits ipn.md.
Apa-Canal Chisinau has no debts to the electricity and gas suppliers and can without any obstacles provide heat. At the company's thermal-fired facilities, current repair works were performed and hydraulic tracking was performed.
Anatol Lichii regretted the fact that in some blocks preparing for the new heating season is not good because of the indifference of administrators of housing stock. Thus, only 31% of the total number of hot water targets by Apa-Canal Chisinau are prepared.
Deputy Mayor Nistor Grozavu said managers would be held accountable if the blocks they administer would not be ready to receive heat.
SA Apa-Canal Chisinau, since 2001, has three thermal power plants, which provide heating services for 80 subscribers through 104 thermal meters.