Road repair works begin in Chisinau
(UPDATE 10:57) Chisinau City Hall informs that throughout the day, road repair works will take place on the following streets:
- Calea Moşilor;
- Vadul lui Vodă;
- Mircea cel Bătrân
- Meşterul Manole.
At the same time, on Monday Night, a new layer of asphalt will be coated on:
- Calea Moşilor;
- Calea Orheiului;
- Tudor Vladimirescu;
- Meşterul Manole;
- Mircea cel Bătrân.
Drivers who pass through the zone are requested to respect the temporary traffic signs.
(07:17) Road repair works begin in the Capital. Therefore, all roads damaged during winter will receive a new coat of asphalt. The works will last two months.
At first, the potholes that appeared after rains and snow will be covered, while in summer, the roads form the Capital will be rehabilitated.
Interim Mayor Silvia Radu assured that she will personally monitor the process, while irresponsible employees will be fired.
For repair works, that might cost to 125 million lei, multiple companies will be contacted.
Chisinau City Hall announced that repair works will be performed on 900 square meters.
Employees will coat roads from the city with asphalt, including in yards of apartment buildings.